|
| Demolition Phase Of Balconies |
|
|
| Temporary Portico During Demolition Phase |
|
|
| Demolition Phase of Balconies |
|
|
| Eldorado III & IV Undergoing Restoration |
|
|
| Close Up View Of Restoration Work |
|
|
| Close Up View of Restoration Work |
|
|
| Contractors: National Concrete Preservation |
|
|
| Balcony View of Surrounding Area from 17th Floor |
|
|
| Balcony View of Fairmont Turnberry Golf Course |
|
|
| Interior Hallway Under Construction |
|
|
| Elevator Lobby Under Construction |
|
|
| Install Ductwork and Downlights in Elevator Lobbies |
|
|
| Elevator Lobby Under Construction |
|
|
| New Unit Door and Ceiling Work |
|
|
| New Unit Doors |
|
|
| Inside View of New Unit Doors |
|
|
| New Door Knocker and Peephole |
|
|
| New Door Lock and Door Knob |
|
|
| New Floor Tile in Elevator Lobbies |
|
|
| New Floor Tile in Elevator Lobbies |
|
|
| A close up view of the master climber. |
|
|
| Master climber and look of balcony as it nears end of demolition phase. |
|
|
| An aerial view of a stack of balconies as it nears end of demolition phase. |
|
|
| Aerial view of Building III under construction. |
|
|
| Close up view of individual balcony demolition. |
|
|
| View of Turnberry Golf Course and Aventura's condominium-townhome community. |
|
|
| Balcony view overlooking Country Club Drive |
|
|
| Construction crew preparing balconies for installation of railings. |
|
|
| Machine used to drill holes on balcony for installation of railings. |
|
|
| Holes drilled into balcony concrete as preparation for railing installation. |
|
|
| Aerial view of stack of balconies with core drilling of holes for installation of railings. |
|
|
| Hallways with new wall coverings. |
|
|
| Hallway with new wall coverings and signage. |
|
|
| Hallway with new wall coverings and signage. |
|
|
| Elevator bank with new wall covering. |
|
|
| Hallway Unit Number Sign. |
|
|
| Unit Numbers |
|
|
| Back entrance of Building 3 |
|
|
| Back of Building 3.
A mesh netting covers each stack of balconies. |
|
|
| Front of Building 3. |
|
|
| Back entrance of Building 4. |
|
|
| Back of Building 4. |
|
|
| Back of Building 4. Demolition phase of balconies. |
|
|
| Back of Building 4. Stages of demolition. |
|
|
| Pool area-entrance to Building 3. |
|
|
| Pool area-entrance to Building 4. |
|
|
| Pool |
|
|
| NEUTRAL TRAVERTINE sample balcony tile 18x18 porcelain. |
|
|
| NEUTRAL TRAVERTINE sample balcony tile 18x18 porcelain.
CLOSE UP VIEW. |
|
|
| RUSSETT sample balcony tile 18x18 porcelain. |
|
|
| RUSSETT sample balcony tile 18x18 porcelain. CLOSE UP VIEW. |
|
|
| WHITE Sample Tile |
|
|
| WHITE Sample Tile. CLOSE UP VIEW. |
|
|
| Finished Hallways |
|
|
| Finished Hallways |
|
|
| New Hallway Mirror & Bench |
|
|
| New Carpeting Design |
|
|
| New Carpeting & Tile |
|
|
| Exterior of Building |
|
|
| Front of Building |
|
|
| Back of Building 4 |
|
|
| Back of Building 3 |
|
|
|
|
|
| Stack of balcony railings waiting to be installed |
|
|
| Balcony railing waiting to be installed |
|
|
| Aerial view |
|
|
| New railings installed |
|
|
| New railing |
|
|
| Boxes of Balcony Tiles |
|
|
| Boxes of Balcony Tiles |
|
|
| Workman installing balcony tiles |
|
|
| Balcony Tile |
|
|
| Balcony Tile |
|
|
| New railing & tile |
|
|
| Neutral color tile and white color tile |
|
|
| Railings installed - front of Building IV |
|
|
| Railings installed - front of Building IV |
|
|
| Front of Building IV |
|
|
| Front of Building IV |
|
|
|
|
| Building 4 Line 9 glass panels are installed |
|
|
| Building 4, Line 9 |
|
|
| Building 4, stack of glass panel balconies |
|
|
| Building 4, Lines 9 & 8 glass balconies |
|
|
| Building 4, Line 3 Close up view of glass panel balconies |
|
|
| View of balcony from inside unit. |
|
|
| View of glass panel balcony from inside unit. |
|
|
| Building 3, Line 3 View of balconies |
|
|
| Building 3 |
|
|
| Building 3, Rear view of balconies |
|
|
| Building 4, Line 8, Workman dismantling master climber |
|
|
| Building 4, Line 8 Workman dismantling master climber |
|
|
| Building 4, Line 8 Workman dismantling master climber |
|
|
| Building 4 Line 8, Master Climber has been removed! |
|
|
| Building 4 Line 8, View of Master Climber coming down. |
|
|
| Building 4 Line 8, View of Master Climber coming down |
|
|
| Building 4 Line 8, View of balconies |
|
|
| Front of Tower 4 Completed |
|
|
| Front of Tower 4, Completed |
|
|
| Front of Tower 4, Completed |
|
|
| Tower 4, Close Up View of Balcony Stack |
|
|
| Front of Tower 3, Work in Progress |
|
|
| Front of Tower 3, Work in Progress |
|
|
| Front of Tower 3, Work in Progress |
|